PROJECT DETAILS
The first phase of this multi-phase project was concluded in 2019, with the construction of two out of a total of six planned buildings. The Phase 1 structures consisted of a parking garage and office building, which included such eye-catching design elements as a large halo and knife-edge corners.
The highly ornate canopy consists of 98,000 square feet of 4-millimeter mica-finished Alucobond aluminum paneling fabricated by Keith Panel Systems of Vancouver, British Columbia.