PROJECT DETAILS
In addition to installing over 60,000 square feet of 2-inch exterior industrial foam panel fabricated by Centria, Pacific Erectors handled the installation of more than 300,000 square feet of steel decking manufactured by ASC Steel Deck on both the building and podium. Two of the most notable features of this project were the projections on the east and west sides of the building.